Sign In | Join Free | My spintoband.com
spintoband.com
Jiangsu Sujian Road & Bridge Machine Co., Ltd.
Jiangsu Sujian Road & Bridge Machine Co., Ltd.
Home > Modular Steel Bridges >

Prefabricated Modular Steel Bridges Painted Bailey Truss Bridge With Steel Deck

Jiangsu Sujian Road & Bridge Machine Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment

Prefabricated Modular Steel Bridges Painted Bailey Truss Bridge With Steel Deck

Brand Name : SJ-Bridge
Model Number : CB100 321
Certification : ISO 9001
Place of Origin : China
MOQ : 10 tons
Price : 800 USD/ton
Payment Terms : L/C, T/T
Delivery Time : 30 days
Material : Q345B Steel
Surface : galvanized or painted
Max Load : 80 tons
Max Span : 45 meters
Standard : ASTM, BS, GB
Deck : Steel Deck
Contact Now

Prefabricated Bailey Bridge/ Prefabricated Modular steel truss Bridge


The Bailey System


Bailey bridges are built on site from a pre-engineered system of ready-to-assemble components. Utilizing standardized prefabricated components, Bailey bridges can be built to match a wide range of vehicular bridging applications. Because of their excellent versatility and overall value, thousands of Bailey bridges have been installed throughout the world.


Features


i. Longitudinal trusses composed by modular steel panels pinned end to end
ii. Transversal girders spanning between the longitudinal trusses
iii. Steel lane decked roadway (single lane) on top of the transversal girders
a. Rapidly modular design: components shall be fully interchangeable with all other of the same type
b. Single lane roadway (clear width 4.2-4.5 m)
c. Suitable for critical harsh environmental conditions:i. Temperatures: -20°C to +60°C.
ii. Wind Speeds: average 45 m/s, gusting to 60 m/s
d. Design Loads:
i. Load Class: 40 tons of tandem wheeled load –(HS25-44 Highway Loading)
ii. Effects of dynamic impact and vehicular eccentricity, wind, etc. (in accordance with Section 3 of the AASHTO or equivalent international standard)
iii. Single lane bridges: be able to sustain a minimum 100,000 cycles of stress due to AASHTO HS25-44 truck (or equivalent international standard)or lane loading, including the effects of dynamic impact and vehicular eccentricity
e. Rapidly erectable installation:
i. Components shall be lifted and carried/lifted/installed by manpower alone, using appropriate tools where necessary
ii. All connections to be made on site, utilizing pins/bolts easily installed with simple hand tools, (e.g. not use of special tools or on-site welding)
iii. Modular span construction based on interconnected individual single span(s) with increment of 3 meters
iv. Roadway with modular steel deck and pedestrian modular steel deck (optional) as cantilever fixed outside the bridge
v. Cantilever installation method, launching the bridge across the gap without any temporary intermediate supports
f. Easy packaging for transportation and loading/unloading:
i. Highly mobile
ii. Allowing bridge(s) de-launching
iii. Allowing bridge(s) dismantling



Product Tags:

Temporary Pedestrian Bridge

      

Temporary Modular Bridge

      
China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

Prefabricated Modular Steel Bridges Painted Bailey Truss Bridge With Steel Deck Images

Inquiry Cart 0
Send your message to this supplier
 
From:
Enter your email please.
To: Jiangsu Sujian Road & Bridge Machine Co., Ltd.
Subject:
Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0